SKU | Docking depth (cm) | Pullout load tested with concrete at -30 (37.5 MPG) | The location of the failure |
Drilling diameter (cm) Extraction force | |||
1521-28 | 12×60 | 33 78.9 | The concrete cube was cracked |
Comes in a pack of 50 units.
SKU | Docking depth (cm) | Pullout load tested with concrete at -30 (37.5 MPG) | The location of the failure |
Drilling diameter (cm) Extraction force | |||
1521-28 | 12×60 | 33 78.9 | The concrete cube was cracked |
Comes in a pack of 50 units.